QUESTION:

I rented a large Ditch Witch with backhoe and blade last week to put in a water line, downspout drains and a power cable. It digs a six inch trench up to 5' deep, and claims to dig 100' per hour (Hah! -- depends on the size of your rocks I put six hours on the clock and put in about 300 feet of 3' deep ditch, some of which had to be dug with the backhoe because of the rocks. The backhoe controls are really crude, no finesse allowed, but it got the job done. Rental rates here

ANSWER:

It must have been the weekend for trenching because my hubby did the same thing. Although, we opted for the Terramite backhoe (little 'un) instead of the Ditch Witch. We grow rocks here...

There were no 1/2 day rates available for the backhoe and the full day rate was $220 so not much diff in $$$. We ended up keeping it 2 days because it took a lot longer than anticipated. My brother Bill was mad that we rented because he is in the business and has a lot of heavy equipment but he's been busy lately and we didn't want to bother him to deliver one of his real backhoes. Bill's point, and it was a good one, is that it would take a LOT longer with the itty bitty Terramite than the 3 or 4 hours with one of his real backhoes. It ended up taking a day and a half to dig a 400' 4' trench from house to barn, plus a few branches off that, probably adding up to another 100' or so.

Code here is 42".

His other suggestion was to use 200 psi well pipe for the water since we often have heavy equipment crossing the trench area. Can't get that from Lowe's or Home Cheapo -- the best they had was 160 psi. The plumbing supply store had it and it was cheaper from them than the 160 from the bargain supply stores, plus they had the yard hydrants in stock.

I think that Eileen's temporary situation is an ideal use for the solar charger. Digging trenches, even small ones, is a PITA having BTDT a few times now. It's much easier to just install the solar charger and boom, you're done.

The other problem with digging trenches, especially of the lengths you mentioned and our application too is that for weekend warriors, there's not enough time to finish the entire project in one weekend (even a 3 day one). Now I have to cross the trench in 5 different spots to get to the barn -- what a MAJOR PITA. The horses are confined to the dry lot until the project is finished since getting to the spring pasture requires going across the trenched area too.